Design and Construction of a Hybrid PV-Power Plant
Expression of Interest - Prequalification
Deadline: Jul 11, 2025
Financing: KfW Entwicklungsbank
Requested Services:
Design, supply and installation of a photovoltaic power plant with a battery energy storage system (BESS) and a hybridised diesel generator, interconnected to SNEL SA's local 15 kV MV network from the Bipemba substation, to supply renewable energy to REGIDESO SA's facilities in Mbuji-Mayi. The services include assistance with the two-year operation and maintenance phase, including skills transfer.